SRK Consulting has recommended that a prefeasibility or feasibility study be undertaken to determine if the mineral resource at the Zandfontein upper group two tailings storage facility (TSF) at Eastern Platinum’s (Eastplats’) Crocodile River Mine (CRM) can be mined economically in the current market environment. SRK completed a mineral resource estimate for the TSF, which includes a total measured and indicated mineral resource of about 13.68-million tons, containing 535 520 oz of platinum, palladium and rhodium at an average grade of 1.218 g/t, 3 404 oz of gold at an average grade of 0.008 g/t and 2.83-million tons of chromium oxide at an average grade of 20.72%.
 
 
 
 
 